Gusher’s goal is to get our pumps in the hands of customers with the minimum wait, while still adhering to our high standards of quality manufacturing. Below are our current manufacturing lead times for standard pump models and common parts.
Please be aware that any deviation from base model design or materials will lengthen lead times. Gusher Inside Sales or National Sales can provide adjusted lead times for custom manufacturing.
Skip the Wait!
For even faster delivery without the manufacturing wait, Gusher’s New Castle, Indiana and Williamstown, Kentucky locations maintain an inventory of stock pumps, ready to ship quickly. For current availability, visit our Stock Sheets.
Vertical Pumps | Lead Time in Weeks |
---|---|
7550 Series Vertical | 6-8 |
7550 Series Enclosed Column | 8-10 |
7550 Series Top Pullout | 6-8 |
Vortex Series Vertical | 11 |
7800 Series Vertical | 4-8 |
7800 Series Enclosed Column | 5-7 |
Molten Metal Series | 16 |
Vertical SEV (CL & NCL) | 8-10 |
Ruthman Series Flanged Mount | 6 |
Ruthman Series Immersed | 5 |
DIN Series Vertical | 20 |
Horizontal Pumps | Lead Time in Weeks |
---|---|
7071 Series | 4 |
7550H Series Close-Coupled CL | 8-10 |
7550H Series Close-Coupled NCL | 9-11 |
7550H Series Horizontal | 12 |
7800 Series Horizontal | 5-7 |
DIN Series Close-Coupled | 26 |
DIN Series Horizontal | 4 |
Vortex Series Horizontal | 10 |
Multi-Stage Series | 6 |
Ruthman Series Horizontal | 4 |
SC Pump Kits | 2 |
Screw Pumps | 7 |
Self-Priming Series (SPP Models) | 4 |
Self-Priming Series (8000 Models) | 8 |
Parts | Lead Time in Weeks |
---|---|
7550/7600 Power Frames in Standard Lengths | 1 |
7600H Power Frames | 2 |
Most Standard Parts | 1 |
Fabricated Plates, Brackets & Braces | 4 |
Self-Priming Parts | 2 |
Tank Units | Lead Time in Weeks |
---|---|
All Gusher Tank Units | 6 |